Case Status:

General Data

Name: Walter Copenhaver

Email: wwcopenhaver@sunocologistics.com

Phone: 484

Company: Sunoco Logistics

County: Cumberland

Municipality: Hampden

Location of Protected System: Sunoco Logistics Pump Station along Sheely Lane

Structure: Sunoco Logsitics Pump Station

Protective System Code: Distributed

Interference Testing Schedule

Companies Involved: Buckeye, Enterprise, UGI and possibly others

Date: 2017-04-03

Time: 9:30 AM

Place: Sunoco Logistics Mechanicsburg Pump Station at the Sheely Lane Gate

Date Complete:


Rectifier Data

Rectifier Designation:

Volt:

Ground Bed Type & Description:

Operating Output:

Date: 2017-04-03

Mine or Railway Drain Data

SubStation:

Owner:

Reverse Current Control:

Wire Size:

Length:

Operating Drain - Amps (Max):

Date: 2017-04-03


Bond Data

Structures Bonded:

Bonded To:

County: Cumberland

Municipality: Hampden

Date: 2017-04-03

Specific Location:

Bond Rating - Amps:

Bond Rating - Ohms:

Bond Rating - Type:


Comments

This new distributed C.P. System is protecting the Sunoco Logistics Mechanicsburg Pump Station piping. The Pump Station is isolated from the mainline. The rectifier and ground bed is located inside the fenced in facility. The Pump Station is located along Sheely Lane and the neareast intersection is East Simpson Street. The Lat and Lon is 40.219641, -76.97859. Contact person is Walter Copenhaver and the cell number is 484-577-0134.


Rate 40 volts, 20 amps
Requesting : 15 volts and 3.8 amps